Bluewater Wind Energy Centre

Development on the Bluewater Wind Energy Centre began in 2006. This project, located within the Bluewater Township, with electrical interconnection extending into Huron East, has a maximum generating capacity of up to 60 megawatts, enough energy for approximately 15,000 homes in Ontario. The project is owned by Cordelio Power and Axium Infrastructure (51% and 49% respectively) and their subsidiaries; it is operated by NextEra Energy Canadian Operating Services, Inc.